President's Report
HMPOA Road Resurfacing
6.10.12
History (partial)
- 2005 - Board created initial plan to resurface all roads – which was to asphalt all by summer 2012.
- 2006 – Chestnut Run and Turkey Ridge asphalted
- 2009 – Hardwick Mountain Drive asphalted from 259’ to top
Coming in June 2012
- Asphalt first 259’ and from top to about Harrell’s drive
Plan for future
- Asphalt the rest – from Harrell’s drive to Turkey Ridge
* * * * *
The cost of resurfacing has increased from $2.54/square yard in 2001 to $15/square yard in 2012 (490%). Over the same time period, our assessments have increased from $220 to $351.38 (59.7%)
Cautions re resurfacing
New asphalt can be driven over gently – but can be damaged with heavy vehicles or fast stops, starts.
Please help us protect our investment by
- Keep heavy vehicles (large trucks, equipment) off for at least 3 days.
- Drive extra carefully until at least the first rain (which will help asphalt set).
- Try to stay off the edges.